Showing posts with label Progress Update. Show all posts
Showing posts with label Progress Update. Show all posts

2015-04-07

Track plan alterations

I had a dilemma at the tunnel where trains heading West from Browning enter or trains heading east exit a tunnel from one of my helix's. As a train was exiting the tunnel, there is a set of cross over switches which will one day be signalled. The problem is firstly, the signal would be very close to the tunnel entrance, making it difficult for operators to see the indication, and more prototypically, if I have a 2 or more lash up of diesels and the lead unit stopped short of the signal, almost all the locos, including the lead would be sitting in the tunnel. I.e. choking themselves and overheating. Not very prototypical at all.
Looking at the very right track as it exits the tunnel, it can be
seen that there is no room for the train to stop without most
of the locos sitting in the tunnel.


My solution was to move the crossovers down the line, giving enough room for a 3 unit loco lash-up to exit the tunnel before stopping short of the signal.



Below, the crossover can be seen now moved further down the line with sufficient space for at least 3 locomotives to be out the tunnel. What can also be seen now compared to the photo above is a cutting I have added to the left. This will now be my new Eurika branch line. Looking down the bottom at the visible staging, Stryker will be on the left side with trains entering from the other side and terminating there. The branch-line to Eureka is at the end of that visible staging on the same side. Before, it used to be on the other side and can be seen in the above photo where there are 3 wagons parked. There were two issues for me. Firstly I did not like it crossing the staging of the other end of the layout (Browning) and secondly, it occupied my return loop, which I want to use for a future operations scenario I will talk about in a future post. So, I ended up with a win win situation.


Below is the track work complete. Just needs scenery now.

2013-08-21

Progress update

OK, It has again been a while since I have done an update. Honestly, other life happenings just took over. Not to say nothing has been happening on the layout though. I have still been doing little things here and there, and mainly operating as well as the odd show layout with the club and the Bend-Track modules we built.

Anyway, I have finally started to concentrate on the layout and East Glacier Park in this instalment. Looking at the photo below, this is a view down the town. This is just for an overview. Further below I go into more details on the specific industries.

In the foreground of the above image is a short spur for the RDC town commuter. I decided to incorporate this to add some more operations. Theoretical, the RDC will transport townsfolk to Whitefish from the various towns along the way. Once in Whitefish, holiday makers will return to East Glacier Park to head to the various ski slopes. Returning later in the day and then bringing the townsfolk home in the evening.

Below is a better photo from the side on. There still will be an Amtrak train, but that will be just once per day and also does not stop at all the towns along the way.


Still in East Glacier Park here are some of the industries. Below is AGM grain and seed on the left and Heinz Dried Fruit on the right.

Down below we have a further two industries. In the far distance is an oil distributor I decided to put in at the last minute. It can be seen that I have not even put the track down yet.

In the foreground, is a wood industry of some kind. I am still in a quandary with this one and am not happy with the layout or kit at this time. It just does not seem correct. So, currently I am mulling this industry over.


Below are two closer views of these industries. The Oil dealer I still need to name, and the timber section will be called Lumbar Logistics.




Well, that is it for now. I will keep you updated on developments as they happen... Or as soon after as is possible :-)