Articles and information about the progress in building my BNSF model railroad in N Scale.
Pages
(Move to ...)
Blog
Modeled Area
Layout tour
Planning
Links
Operations
Knowledge Base
▼
2015-11-10
1st Op session debrief
›
After my first ops session, we all sat down outside with boerworse rolls, snacks and drinks for a chin wag and a debrief. Most of the issues...
My First Operating Session
›
Yesterday the 8th November, I finally hosted my first operating session. It is absolutely unbelievable how well it went! I had a buzz for th...
2015-11-05
1st Operations session "Prep"
›
I really must write more often :-( During the last club visit to my layout, and also a couple of months ago from my brother and a friend, ...
2015-04-07
Scenery work
›
Over the Easter weekend, I decided to tackle some of my scenery. In particular, the covered helix between East Glacier Park and Browning. T ...
Track plan alterations
›
I had a dilemma at the tunnel where trains heading West from Browning enter or trains heading east exit a tunnel from one of my helix's....
2014-08-11
Putting Graffiti on my cars
›
To begin with, my current preferred method of moving cars around the layout is with the “4 turn Car Card system”. I have tried the “Tab ...
2014-04-22
Tam Valley Depot QuadLN Loconet servo controlers and IO
›
I have been doing a lot of research for a cost effective switch controller and actuator that would give me the biggest bang for my buck. W...
Scenery update and one Helix covered
›
There has been lots of work done on the layout since the last post, however, just not documented in this Blog unfortunately. I really must t...
2013-12-23
The Blue Train (Prototype)
›
Although not “model” train related, this post is “prototype” train related. Earlier this month on the 4th, 5th and 6th December, L...
1 comment:
›
Home
View web version